The chart below shows you the skip and hit patterns for Mega Ball number , in Texas Two Step draws, from Fri May 18, 2001 to Thu Dec 19, 2024. There were 2463 draws during this period, and the chart is updated after each Texas Two Step winning results are announced.
Texas Two Step is designed as a lottery game that consists of choosing 4 winning numbers from a pool of 35 numbers, and a Mega Ball number from a separate set of 35 numbers.
In theory, for the last 2463 draws that have taken place Fri May 18, 2001 through Thu Dec 19, 2024, each Mega Ball number should appear 71 times. However, number has appeared 17 times, which was below average performance. Its last appearance was on the Thu Jul 22, 2010 draw, when the winning numbers were 4-6-22-33-12.
In the past 2463 draws from Fri May 18, 2001 to Thu Dec 19, 2024, the longest time period Mega Ball number did not appear was 219 draws. The shortest time period Mega Ball number did not appear was 3 draws.
This is no skip patterns appeared significantly more than others.See the chart below for more detailed information on Mega Ball number 's skip patterns. The orange horizontal bars show the length of each skip, with longer bars showing the longer skips.
Texas Two Step Mega Ball 12 Skip and Hit Patterns | |
Draw Date | Hits and Skips |
Mon Dec 13, 2010 | 8-13-23-30-35 |
Skips | 41 |
Thu Jul 22, 2010 | 4-6-22-33-12 |
Skips | 72 |
Mon Nov 09, 2009 | 3-13-30-32-12 |
Skips | 75 |
Mon Feb 16, 2009 | 7-15-17-18-12 |
Skips | 12 |
Thu Jan 01, 2009 | 3-6-10-35-12 |
Skips | 3 |
Thu Dec 18, 2008 | 2-9-15-31-12 |
Skips | 8 |
Mon Nov 17, 2008 | 25-27-30-34-12 |
Skips | 48 |
Thu May 29, 2008 | 5-15-20-31-12 |
Skips | 108 |
Mon May 14, 2007 | 4-13-16-30-12 |
Skips | 12 |
Thu Mar 29, 2007 | 1-13-28-33-12 |
Skips | 96 |
Mon Apr 24, 2006 | 7-16-26-32-12 |
Skips | 30 |
Thu Jan 05, 2006 | 5-19-22-26-12 |
Skips | 3 |
Thu Dec 22, 2005 | 6-9-11-14-12 |
Skips | 219 |
Fri Nov 14, 2003 | 19-26-27-28-12 |
Skips | 14 |
Tue Sep 23, 2003 | 1-19-29-32-12 |
Skips | 58 |
Fri Feb 28, 2003 | 1-19-20-21-12 |
Skips | 48 |
Tue Sep 10, 2002 | 7-10-23-28-12 |
Skips | 50 |
Fri Mar 15, 2002 | 3-14-21-30-12 |
Skips | 87 |